Case studies

CC Ground Investigations Limited were engaged to deliver geotechnical ground investigation data for the design of a new highway overbridge, attenuation ponds, a roundabout, and a noise bund.
CC Ground Investigations Limited were engaged as part of the team delivering the ground investigation to determine ground conditions at Barnetby Sidings, Lincolnshire.
CC Ground Investigations Limited were engaged as part of the team delivering ground investigation data to investigate slope instability at Southend-on-Sea.
A ground investigation was required to provide geotechnical and geo-environmental survey data from the area around Essex Arena Raceway, Thurrock. A desk study revealed that the site had undergone numerous phases of mineral extraction, leaving a legacy that included gravel pits and chalk quarries.
A multidisciplinary ground investigation was required to provide geotechnical and geo-environmental data for the proposed redevelopment for housing at a former airfield site.
View of railway overbridge
A ground investigation was required to provide geotechnical data and investigate potential mining beneath the site with specific regard to any potential mining risk associated with the proposed infilling works to an underbridge.
View of drilling rig on road
CC Ground Investigations Ltd were engaged as Principal Contractor to carry out a site investigation within the road and adjacent third-party land. The road is currently closed to traffic due to ground movement affecting the carriageway.
Rig drilling on flood plain within fencing
Acting as Principal Contractor, CC Ground Investigations were engaged to undertake a ground investigation to assist in the assessment of contamination across a site in Herefordshire.
A ground investigation was required for Phase 1 of a new link road south of Princes Risborough as part of the town’s development plans.
CCGI were contracted by Bath and North East Somerset Council to undertake a ground investigation to assist with the redevelopment scheme at Bath Quays North.
A Ground Investigation was required for a high-profile mixed-use development in the heart of Fulham, transforming a redundant gasworks site into a high-quality new urban quarter
Ground investigation work was undertaken west of Milton Keynes along 22Km of live and mothballed railway, public footpaths, existing stations, and road bridges.
CC Ground Investigations Limited was contracted to assist with the design of a new 8km Bypass to the West of Hereford City Centre.
CC Ground Investigations Limited was appointed by Highways England to undertake a ground investigation on the M25 in Somerset as part of new Driver Information and Queue Protection Schemes.
CCGI completed a ground investigation to aid the design of repair and remediation works at Hinksey Hill embankment which had suffered a catastrophic rotational slip failure.
The purpose of this investigation was to assess the ground conditions likely to be encountered during the installation of a new sewer and to assess the stability of the slope.
Ground investigation work was undertaken on a large gasworks site in East London. Two shell & auger rigs and two multi-purpose rotary rigs were used.
Ground investigation work was undertaken inside and immediately adjacent to the 132kv and 400kv substations at Ratcliffe Power Station, Nottinghamshire.
Ground investigations works were undertaken as part of the Northern Hub scheme which is a programme of targeted upgrades to the railway in the North of England.

Talk to a Ground Investigation Expert

Our team are waiting to discuss your ground investigation project